Sisi Hydro Power Project in Uganda

Region: Eastern Region, Uganda
Client: Aurecon South Africa/ responsAbility
Period: 2017/2018
Role:

Aurecon South Africa was appointed by responsAbility Renewable Energy Holding as the main consultant to conduct a Bankable Feasibility Study (BFS), Environmental Impact Assessment (EIA) and Resettlement Action Plan (RAP) for Sisi HPP. Aurecon further subcontracted Proess to carry out the EIA and RAP studies for the proposed Sisi HPP in compliance with the Ugandan legislation and International Finance Corporation (IFC) Performance Standards (PS) and other PS, or published guidelines.

Deliverables:
Proess prepared the EIA and RAP for the project. The services included:

  • Preparation of an EIA.
  • Preparation of RAP.
  • Socioeconomic baseline surveys.
  • Cadastral survey of affected land.

The studies conducted for Sisi HPP include socio-economic baseline, air and noise assessment, aquatic ecology baseline, environmental flow study, biodiversity studies (flora and fauna assessment), archaeological studies, geotechnical investigations and cadastral survey of affected land.

Reference Sheet Download: Sisi Hydro Power Plant