Prefeasibility of Approximately 200 MW Hydro Power Portfolio in Zambia

Client: Mpishi Energy
Period: 2017
Role:

Proess was engaged by Mpishi Energy to conduct a pre-feasibility study of 8 hydro power sites with a generation capacity upwards 200 MW.

Deliverables:
The services and activities carried out for the project included:

  • Reconnaissance survey of proposed hydropower sites.
  • Preliminary hydrologic studies.
  • Analysis feasibility of power evacuation from proposed hydro sites.
  • Preparation of detailed feasibility reports for the hydro-power sites.

Reference Sheet Download: Prefeasibility of Approximately 200 MW Hydro Power Portfolio in Zambia


Recent Posts