Kikagati Hydro Power Project 2 in Uganda and Tanzania

Region: Uganda / Tanzania
Client: Kikagati Power Company Limited
Period: 2016 / 2018
Role:

The Project involved providing additional geological mapping and sediment studies as well as additional topographic surveys for a proposed 14 MW Kikagati Hydropower Project in Uganda/Tanzania on River Kagera.

Deliverables

  • Water level measurements.
  • Sediment loading tests.
  • Development of a tail water rating curve.
  • Earth works estimation.

Reference Sheet Download: Kikagati Hydro Power Project 2


Recent Posts